Muskegon Water Filtration Plant
This $15.6 million Water Filtration Plant renovations
and improvements project for the City of Muskegon was competitively
bid and awarded
to Muskegon Construction Company late in 2003 and is expected
to be completed by October 2005. The project includes an existing
sedimentation basin being converted into a pretreatment building;
existing filter beds are being renovated with new filter drain
blocks, filter media and backwash system; existing sludge ponds
are being replaced with new concrete sludge frying basins; an
old abandoned water intake structure is being converted into
a recycle pump station; an auxiliary pump building (built in
1928) is being refurbished inside and out; several additional
pumps are being added; existing overhead electrical power lines
are being replaced with underground lines; and electrical service
is being upgraded. The plant is to be kept in operation during
all phases of construction and tie-ins.
|